2014hs.igem.org/team:Charlottesville RS/Notebook/031014

From 2014hs.igem.org

(Difference between revisions)
(March 10th, 2014)
(March 10th, 2014)
Line 407: Line 407:
Worked on our homemade shaker. The shaker needs to be able to fit inside our incubator, which is pretty small. Drilled holes in base-plates for dowels and set screws to keep dowels in place. Also measured the plates we need for the tubes to sit in, and marked them to be cut at a later point and drilled.
Worked on our homemade shaker. The shaker needs to be able to fit inside our incubator, which is pretty small. Drilled holes in base-plates for dowels and set screws to keep dowels in place. Also measured the plates we need for the tubes to sit in, and marked them to be cut at a later point and drilled.
-
[https://2014hs.igem.org/Team:Charlottesville_RS/Notebook/Overview | Back]
+
[[https://2014hs.igem.org/Team:Charlottesville_RS/Notebook/Overview Back]]

Revision as of 13:09, 5 May 2014

March 10th, 2014

John Grammer

Worked on our homemade shaker. The shaker needs to be able to fit inside our incubator, which is pretty small. Drilled holes in base-plates for dowels and set screws to keep dowels in place. Also measured the plates we need for the tubes to sit in, and marked them to be cut at a later point and drilled.

[Back]